Location: Section no. 4, on the Turda - Sebes highway
Project details: The asphalt is made with the Benninghoven TBA 240 asphalt station, for which TSTC provided the assembly, the technical part and the consulting for the PORR company. PORR is the first company to pour asphalt in two layers on the entire highway section: the first layer is BAD, and the second layer AB2. The asphalt has already been poured on an area of 4 km.
Throughout the work, PORR benefited from consulting and assistance provided by TSTC, for the proper operation of the asphalt mix station.